We turn your development needs and aspirations into powerful digital solutions that drive growth
Course Sector : Electrical Engineering
Duration | Date from | Date to | Course Venue | Course fees | Book a course |
---|---|---|---|---|---|
5 Days | 2025-05-12 | 2025-05-16 | Geneva | $5,950 | Book now |
5 Days | 2025-09-22 | 2025-09-26 | Abu Dhabi | $4,250 | Book now |
5 Days | 2025-12-22 | 2025-12-26 | Dubai | $4,250 | Book now |
5 Days | 2025-12-14 | 2025-12-18 | salalah | $4,250 | Book now |
In an ideal AC power system, the voltage and frequency at every supply point would be the constant and free from harmonics, and the power factor would be unity. Most Industrial loads have lagging power factors. That is they absorb reactive power. The load current therefore tends to be larger than is required to supply the real power alone. Only the real power is ultimately useful in energy conversion and the excess load current represents a waste to the consumer, who has to pay not only for the excess cable capacity to carry it but also for the excess joule loss produced in the supply cables.
The supply utilities also have good reasons for not transmitting unnecessary reactive power from generators to loads. Their generators and distribution networks cannot be used at full efficiency, and the control of voltage in the supply system can become more difficult. Supply tariffs to industrial consumers almost always penalize low power factor loads.
Most AC power systems are three-phases, and are designed for balanced operation. Unbalanced operation gives rise to components of current in the wrong phase sequence (i.e. negative and zero sequence components). Such components can have undesirable effects, including additional losses in motor and generator units, oscillating torque in AC machines, increased ripple reactive in rectifier, malfunctions of several types of equipment, saturation of transformers, and excessive neutral currents.
The load compensation improves the phase balancing and power factor correction of unsymmetrical loads. Many utilities need this particular course, which cover the illustration of main concepts of reactive power management using actual case studies.
Module (01) Introduction Definitions
Module (02) Reactive /Reactive Power
Module (03) Means of Reactive Power Compensation (Theory & Application)
Module (04) Power Factor Correction Voltage Regulations
Module (05) Capacitor Banks
Module (06) Fixed Capacitor Banks
Module (07) Unsymmetrical Loads
Module (08) Power Measurements
BOOST’s Professional Attendance Certificate “BPAC”
BPAC is always given to the delegates after completing the training course,and depends on their attendance of the program at a rate of no less than 80%,besides their active participation and engagement during the program sessions.
Since 2001, we have been pioneering the training field in the Middle East, helping individuals, teams, and organizations reach their full potential with integrated solutions.
Sister Companies to Boost Consulting and Training
And Recommended Training Courses
We believe in progress for everyone.
We helped more than 10,000 clients over 20 countries on 4 continents in boosting their knowledge, skills, and careers.
Boost Training And Consulting All Copyrights Reserved 2025